Search

0 products

No products found

Try adjusting the filters or selecting another subcategory.

Get Multiple Factory Quotes for Your Parts in 24 Hours

Connect with 800,000+ listed factories in Asia. Receive multiple quotes for your parts and manage production with speed and confidence.

Timing Belt Pulleys from verified Chinese factories

Timing Belt Pulleys in HTD, GT2 and XL Tooth Profiles

Six weeks after passing initial inspection, timing belt pulleys with groove angles outside tolerance or non-uniform surface hardness start shredding belts in production. Avoiding that outcome starts with sourcing from the right factory — when comparing suppliers below, focus on groove angle tolerances and documented hardness uniformity across batches. Each listing displays production capacity, certifications, and equipment inventories for side-by-side comparison.

These profiles include company size, years in operation, QC staff count (typically 3-8 technicians), and product range with visible pricing tiers. But specs alone can't tell the full story — send inquiries directly through the platform to discuss tooth profiles, timing pulley stock, pitch requirements, material grades, and hardness specifications. For custom configurations or side-by-side supplier comparisons, submit an RFQ detailing tolerances like ±0.02 mm on tooth profile and diameter, surface finish requirements (Ra at or below 0.8 µm), hardness range (45-55 HRC), and certifications such as ISO 9001 or IATF 16949 for automotive applications.

Frequently Asked Questions

How Do I Verify Factories Can Hold ±0.02 mm Tolerances on Tooth Profiles Before Committing to an Order?

collapse

Request sample orders (5-10 pieces) with full dimensional inspection reports showing actual measurements on tooth profile, pitch diameter, and groove angles. Ask which CNC equipment they use. Swiss-type lathes and 5-axis machines deliver tighter tolerances than 3-axis setups. Confirm they have in-house CMM inspection capabilities.

What Should I Specify in My RFQ to Avoid Inconsistent Hardness or Poor Surface Finish?

expand

Specify exact material grade (40Cr or 45# steel), hardness range (45-55 HRC), heat treatment method (quenching and tempering), and surface finish in Ra values (Ra at or below 0.8 µm for precision applications). Require material traceability certificates and hardness test reports with each batch, and ask factories to describe their heat treatment process and surface grinding capabilities in quote responses.

Can I Order Small Quantities for Prototyping Without Meeting 100-500 Piece Minimums?

expand

There's no platform MOQ requirement for RFQ submissions, so request quotes for any quantity including 10-25 piece prototype runs. Expect 3-5 responses for very small quantities at 40-60% higher per-piece pricing versus volume orders. Many manufacturers accommodate low initial quantities to establish relationships.

Why Do Actual Lead Times Run 6-8 Weeks When Quotes Say 4-6 Weeks?

expand

The gap happens because of quality holds during first article inspection, where dimensional tolerances on tooth profile and pitch get rejected and require remachining. Ask factories to break down timelines: raw material procurement (1 week), machining (1-2 weeks), heat treatment (3-5 days), finish grinding (1 week), and inspection (2-3 days), then build in a 1-2 week buffer for potential rework.