0 products
No products found
Try adjusting the filters or selecting another subcategory.
Get Multiple Factory Quotes for Your Parts in 24 Hours
Connect with 800,000+ listed factories in Asia. Receive multiple quotes for your parts and manage production with speed and confidence.

Critical production windows often close while you wait for single axis robots that meet a ±0.03mm repeatability standard. While many suppliers quote 10–12 week lead times, the deeper challenge lies in distinguishing between true linear actuator specialists who machine their own high-precision ball screws and general automation resellers who outsource critical components.
This is where Haizol provides a direct link to Chinese manufacturers specializing in single axis robots, including single axis mastering fanuc configurations and precision motion systems. By reviewing detailed factory profiles, you can assess manufacturing depth and equipment ranges before initiating contact. For custom builds, submitting an RFQ with your CAD drawings allows you to receive multiple comparable quotes within approximately 24 hours from capability-matched manufacturers. Standard configurations typically attract more responses.
Technical coordination is streamlined by a dedicated English-speaking account manager who assists with specification clarification at no extra charge. Before sharing proprietary files, you can secure your designs through three NDA protection levels: standard, enhanced, or comprehensive. Every factory profile offers transparency regarding company size, quality control personnel density (typically 5–15% of the workforce), and historical production categories.
However, the most critical data — backlash measurements, preload configurations, and metrological certifications — only becomes available when you engage with factories directly. Our platform connects your RFQ to an 800,000+ supplier network, where 90% of requests receive 8+ competitive bids. While there is no platform-imposed MOQ, individual manufacturers typically require 20–50 units for fully integrated single axis robots.
Define your stroke length (typically 100mm to 2000mm), payload capacity, and velocity requirements. It is essential to specify exact tolerance needs for positioning accuracy and repeatability (±0.01mm to ±0.05mm). We recommend noting your motor preference (stepper vs. servo), mounting configuration, and required certifications like ISO 9001 or RoHS to ensure the factory confirms their technical capability upfront.
Request the specific linear guide brand and accuracy grade (typically C3–C7) that each factory intends to use. Manufacturers utilizing precision-grade components will document these in their quotes, whereas resellers using unbranded parts may omit these details. You should also ask for sample inspection reports showing actual measured straightness and parallelism, which should ideally fall within ±0.01mm to ±0.03mm per 300mm of travel.
Haizol has no platform-wide MOQ for RFQ submissions, although factories often quote 20–50 units as a minimum due to setup costs for custom gearboxes and motor integration. Some manufacturers specializing in single axis robots will produce 5–10 prototype units—at a 40–60% higher per-unit rate—if you indicate a clear path toward volume production. We suggest explaining your validation phase clearly so suppliers can structure a two-phase quote.
Before placing a production order, request sample units accompanied by dimensional inspection reports showing actual measured values against your ±0.02mm callouts. Specify that you require documentation regarding their grinding and assembly processes for the lead screw or belt drive system. For high-stakes applications, have the factory run a repeatability test over 1,000 cycles and provide the raw data set for analysis.
While factories often quote 6–8 weeks, actual delivery frequently extends to 10–12 weeks when custom gearboxes are involved. We recommend asking whether the gearbox is produced in-house or outsourced. Standard ratios (3:1, 5:1, 10:1) using off-the-shelf components can deliver in 6–7 weeks, but custom ratios or specialized mounting flanges typically add 3–4 weeks to the timeline.