Search

Upper Arm Assembly Tooling

Min. order: --

Product Info

Category: Assembly

Material: Carbon Steel

Capacity: --

Factory

HaiNing, Zhejiang, China
Membership Premium Member 1 yrs
Employees
1-50
Factory Size
1,000-3,000 ㎡
Year Established
2012

About Upper arm assembly tooling

This tooling is mainly used for the welding and assembly of excavator boom. The frame is made of 20# channel steel, the worktable is made of 20mm thick steel plate (Q235), and the other auxiliary fixtures are made of Q235. All welded structural components are machined after welding, with machining accuracy of ±0.05mm and assembly accuracy of ±0.3mm. The design cycle of this tooling is 10 days, the manufacturing cycle is 30 days, and the commissioning and acceptance period is 7 days.

Product Info

Product Category
Assembly
Material
Carbon Steel
Capacity
--
Minimum Order Quantity (MOQ)
--

About Factory

Company logo
Zhejiang, China
Membership Premium Member 1 yrs
View Factory

Core Services

Fabrication
Machining
Assembly

Factory Info

Process
Fabrication, Machining, Assembly
Address
No. 6 Longzhu Road, Chang'an Town, Haining City, Jiaxing City, Zhejiang Province, HaiNing
Region
Zhejiang, China
Certification
ISO 9001, ISO 45001, ISO 14001
Year Founded
2012
Outsourced Secondary Processes
Waterproof & Moisture Related Materials
Automation Industry
Fasteners Industry
Pharmaceutical Biotechnology
Electric Vertical Take-off & Landing Aircrafts (eVTOLs)
Kitchen Appliances
Machinery & Equipments Manufacturing
Manufacture of Additive Manufacturing Equipment
Logistics Industry
Scientific Research & Laboratory
Boiler Industry
Medical Equipment
Automotive Industry
Factory Size
1,000-3,000 ㎡
Type of Enterprise
Job Shop/Contract Manufacturer
Number of Employees
1-50
Annual Revenue
$1,500,001 - 3,000,000
Main Market
China

Get Manufacturing Quotes Quickly without High MOQs

Haizol connects buyers with 800,000+ verified factories in global, empowering businesses to manufacture confidently with speed and savings.